1

Top berlin Geheimnisse

News Discuss 
Hinein 1993 the power grid connections in the Berlin-Brandenburg capital region were renewed. Rein most of the inner districts of Berlin power lines are underground cables; only a 380 kV and a 110 kV line, which zulauf from Reuter substation to the urban Autobahn, use overhead lines. The Berlin 380-kV https://israelsycgk.wikifrontier.com/7627124/etwa_krimidinner

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story