During the preparation from the Performing platform and before the beginning with the drilling, an investigation really should be performed to guarantee the absence of any obstructions with the pile spots. The withdrawn tube is equipped having a Unique flat iron shoe and once again pushed in the identical hole. https://andysjufm.bloggerchest.com/32484145/about-cast-in-situ-piles-in-bangladesh