To begin with, the Jai Hind metro station was planned being elevated. Nevertheless, the AAI objected that the elevated extend up for the airport may possibly pose a menace to plane, And so the route was additional reworked and the station was shifted underground, 150 m from the Airport terminal making. https://railway-group-d-jobs35555.dm-blog.com/32170646/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf