A demurrage demand in dry bulk shipping is often a charge imposed over the charterer if the process of loading or unloading cargo at a port will take longer than the agreed-on time, known as laytime. Ports have limited Place, and every delay results in a ripple impact. When cargo https://cashjszfm.myparisblog.com/35614468/the-smart-trick-of-106-on-demand-guarantee-enforcement-conditions-that-nobody-is-discussing