1

High-Efficiency 400 kW Chiller Installation Achieves Fifty Thousand Pounds Annual Energy Savings and 200 Tonnes CO₂ Saving

News Discuss 
Project Summary Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a major confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation improves cooling reliability while lowering overall energy usage and CO₂ emissions. https://bookmarkinglife.com/story6333289/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story