1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts cooling reliability while cutting overall power consumption and CO₂ discharge. https://get-social-now.com/story6137528/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story