The effects demonstrate that in the event the pressure stabilization time is 2 min, the coincidence degree from the indoor and subject drilling fluid lost control performance is the best along with the analysis results of the drilling fluid lost control performance is “fantastic. Pre-educated ensemble types formulated on https://vertechs.pixnet.net/blog/posts/877816055145066211